When to Schedule Your Asphalt Work in Edmonds
You've got an asphalt driveway, and you want it to last. That's smart. But knowing *when* to do the work, especially here in Edmonds, can be tricky. Our weather isn't always straightforward, and it plays a huge role in how well your asphalt cures and holds up.
Generally, the best window for most asphalt work – whether it's a new installation, a significant repair, or even just sealcoating – is late spring through early fall. Think May, June, July, August, and maybe early September. Why then? Because you need consistent warmth and, crucially, dry conditions. Asphalt needs to cure properly, and that means no sudden downpours or freezing temperatures messing with the process.
I've seen folks try to push it into October or November, hoping for a dry spell. Sometimes it works out, but often, you're just asking for trouble. The ground temperatures drop, the air gets damp, and you risk a less durable finish. It's just not worth the gamble if you want your investment to really pay off.
Weather Conditions That Make or Break the Job
Let's talk specifics about weather. It's not just about